Powering the Future How Santee Cooper Is Leading South Carolina’s Generation

 South Carolina is growing at an unprecedented pace, transforming into a vibrant hub where both families and enterprises thrive. Across our state, local communities are expanding alongside world-class businesses. At Santee Cooper, we are rising to meet this moment to ensure that as our state grows, every home, school, and business has the reliable, power it needs to succeed.

What does a growing South Carolina mean for you? It means we need an energy system that is modern, dependable and ready for growth. That is why Santee Cooper is upgrading our power stations, bringing enough new energy to run millions of homes while strengthening the grid that delivers it directly to our communities. This isn’t just about building plants; it’s about making sure your lights stay on during storms and ensuring our state has the power to keep local jobs growing.

Here is how we are securing your energy future, project by project.

Generation Project Portfolio at a Glance

Rainey Combined Cycle Conversion

workers at Rainey Generating Station

Winyah LM6000 Units

Construction at Winyah Generating Station

Canadys Station

rendering of proposed Canadys Station

Pinopolis Reliabiity project

people discussing project board

Rainey Combined Cycle: Producing More Power with Zero Extra Fuel

construction at Rainey Generating Station

At our Rainey Generating Station in the Upstate, we are converting simple-cycle combustion turbines (Units 2A and 2B) into a closed-loop combined-cycle system by installing heat recovery steam generators (HRSGs) that capture high-temperature exhaust.  This closed-loop system captures the trapped heat and uses it to boil water into steam. That steam then spins a second turbine to create even more electricity.

construction at Rainey Generating Station
construction at Rainey Generating Station
construction at Rainey Generating Station

By capturing and recycling our own waste heat, we will add 184 megawatts of clean capacity to our system without burning extra natural gas. Alongside other upgrades at the facility will bring total new generation to 250 MW.

Latest Progress

  • Substructure construction and cooling tower installation are fully complete.
  •  The condenser assembly, structural steel erection and steam turbine generator assembly are almost complete.

Winyah LM6000s: Added Flexibility for the Grid 

construction of combustion turbines at Winyah Generating Station

In Georgetown County, we are adding two new simple cycle combustion turbines (CTs) at the Winyah Generating Station in Georgetown County.   These units are built for speed and reliability when the grid faces stress. They can go from completely shut down to full power in less than 10 minutes, allowing them to step in immediately when energy demand suddenly skyrockets. Additionally, because they are dual-fuel units capable of running on either natural gas or fuel oil, they provide a critical layer of fuel flexibility to keep the power flowing even during supply shortages.

construction at Winyah Generating Station
construction of combustion turbines at Winyah Generating Station

Latest Progress

  • Soil improvement is complete.
  • Substructure work is currently underway, with rigid inclusions completed and load transfer platforms/foundations currently in progress.

Canadys Natural Gas Combined-Cycle: Transforming a Historic Site into a Baseload Giant

rendering of proposed Canadys plant

 In Colleton County, Santee Cooper and Dominion Energy are transforming a former coal site into a state-of-the-art 2,200 MW natural gas combined-cycle powerhouse. Santee Cooper’s 1,100 MW portion will provide high-efficiency, around-the-clock baseload generation to power more than half a million South Carolina homes. 

Latest Progress

  • The project received unanimous approval from state regulators to begin building our groundwater wells, and the final air permit was issued in November 2026. 
  • We have already secured the reservations for our major machinery, including turbines and transformers.

 Pinopolis Reliability Project: South Carolina’s Largest Battery Installation

scenes from APYA meeting

At our Jefferies Generating Station, we are helping shape the future of clean energy in South Carolina. 

Developed under a tolling agreement with AYPA Power, the Pinopolis Reliability Project is planned as a massive 300 MW battery energy storage system (BESS).  This Lithium Iron Phosphate (LiFePo) facility will act as an energy reservoir, charging during low-cost solar hours and discharging during peak evening demand. 

Latest Progress

  • Major equipment commitments were successfully completed in Q3 2026. 
  • Our partner, AYPA, is delivering equipment faster than originally planned, having already secured key electrical parts, including breakers and transformers, in the fall of 2025.

Through these combined efforts, we are doing more than just building power plants: We are leading the way to power what’s next for South Carolina.